ULYSSES - PO Box 493, 2871 West Oklahoma, Ulysses, Kansas 67880
Phone: 620-356-4785
HUGOTON - PO Box 637, 823 East 11th, Hugoton, Kansas 67951
Phone: 620-544-2606
PERRYTON - PO Box 1132, 12785 loop 143 Perryton, TX 79070
Phone: 806-648-2870


Lay any size steel pipe
Set & pipe in compressors
Repair existing pipelines
Set & tie-in meter runs
Any size road bores
Install gathering systems
Maintain roads
Haul gravel & rocks
Fabricate security cages
Dirt Contracting

BP:  West Main Slug Catcher Facility

BP:  26 and 30 inch BP rehab project - ongoing

ExxonMobil: Set 210 new pumping units, water tanks, and laid electric and water lines on all locations.

ExxonMobil: Set 12-400 bbl fiberglass tanks, 3-300 bbl steel tanks, 6 separators, and built berms and fences around all equipment.

BP: Set 100-210 bbl fiberglass tanks and laid 20 miles of electric and water lines.

Pioneer Natural Resources: Built 19 new locations, including pumping units, water tanks, meter runs, sales lines, water lines, and electric lines.

 

The Sunflower Highway 50 Pipeline Relocate Project.
16 inch value setting and stoppeling with bypass to insure no interruption of service to the sunflower electric Holcomb Station.

   

BP Sandhills Project.  5 miles of 16 inch steel pipe with a 250 wall and 16 inch direction river bore. 1600 feet under Arkansas river in Kearney County Kansas.

 

 

 

© All rights reserved. Spectra Creations, 2010.

Home | Construction | Roustabout | Managers | Office | HSE | Projects | Mobile